MEP Coordination and Clash Detection: Why They Matter

MEP coordination and clash detection find conflicts between ducts, pipes, cable trays and structure before construction, cutting rework, cost and delays on site.

A building's ceiling void is a crowded space shared by ventilation ducts, heating and cooling pipes, fire sprinkler lines, cable trays and lighting. When these systems are designed in isolation, clashes with one another or with beams and columns become almost inevitable on site.

What is clash detection?

Clash detection means combining the BIM models of different disciplines and using software to find elements that occupy the same space or violate required installation and maintenance clearances. These checks can be run inside Revit or in coordination tools such as Navisworks.

Types of clashes
  • Hard clash: Two elements occupy the same space, for example a duct passing through a beam.

  • Soft (clearance) clash: Elements don't touch, but the space needed for insulation, installation or maintenance isn't provided.

  • Workflow clash: Problems caused by installation sequence or scheduling.

How does the coordination process work?

Models are combined at regular intervals, clashes are reported, and each one is assigned to the responsible discipline. Priorities are set in coordination meetings: gravity-driven and large-section services (drainage pipes, large ducts) usually take precedence, and more flexible services are rerouted around them. The cycle repeats until no critical clashes remain.

What it brings to the project
  • Less rework and material waste on site

  • More realistic schedules and cost estimates

  • Preserved ceiling heights and fidelity to the architectural design

  • Clear, buildable drawings for installation crews

At CS Mekanik Proje we treat MEP coordination as an integral part of design and aim to hand projects to site with clash-free models.